The cricket club at Budleigh Salterton needed to be relocated away from an area prone to flooding so that intertidal habitat could be created in the area currently occupied by the existing club.
Carrick Construction was engaged to carry out this project by Kier Construction, who tasked us with the design of the cricket pitches, outfield and pitch drainage, the design of a maintenance plan and maintenance of the pitches and outfield as well as the design of the surface water management system for the entire project (including the proposed pavilion and car park) and construction monitoring.
Prior to work commencing, comprehensive level adjustment works were required to achieve the necessary platforms for the cricket pitches and outfields, meaning additional work needed to be included in a tight 16-week construction programme, prior to the 12-month establishment and maintenance phase.

Carrick ensured that there was a focus on sustainability throughout this project.